PROJECTS

CHEMICAL AND PETROCHEMICAL

We carry out, in different Chemical Industry Plants, the execution of Engineering projects and their associated services; mainly from the specialty of Instrumentation and Automatic Control.

Unilever de Argentina

Unilever de Argentina

Liquid Hall Expansion - Tortuguitas Plant Extended Basic Engineering of civil / structural, Mechanical / piping, electrical and cost study. Instalations revision and new layout design to include the expansion. Concrete and structures calculation reports. Demolition...

Unilever de Argentina

Unilever de Argentina

New spray filling hall - Tortuguitas Plant Multidisciplinary basic and detail engineering development (all disciplines). P&Id´s design. Installations redefine and new Layout development. Concrete and structures calculation reports. Process equipments specification...

Papelera del Plata

Papelera del Plata

New Tissue Paper Hall Grounding Instalation Detail Engineering design and atmosphere protections of the new Tissue Paper Hall.

Lanxess

Lanxess

P&I’s diagrams consolidation - Zárate Plant On-site surveys to upgrade the P&Ids of Zárate Plant and engineering documents development. The existing engineering documents were all in paper files and designed under company’s normative, that's why we had to do a...

Compañía Mega S.A.

Compañía Mega S.A.

Firefighting system design in Bahía Blanca Plant Descripción: Existing system evaluation according with NFPA regulation. Installation update proposal by calculating, recommending and specifying of a robust and modern system, according to plant’s facilities....

SC Johnson (Contratista: Estudio Biglieri & Llorens)

SC Johnson (Contratista: Estudio Biglieri & Llorens)

Pampero Project - Pilar Plant Instruments and Control Basic and Detail Engineering design. Instruments , control system and mounting materials specification. Control architecture development based on Profibus communication and components specification. Loop diagrams...

Unilever de Argentina

Unilever de Argentina

New Boiler Room - Tortuguitas Plant Multidisciplinary Basic Engineering, Including all the disciplines. Flowsheet, mass balance and P&Id´s development. Calculation sheets and descriptive report of the involved systems. Installation Layout design and Key Plan...

Unilever de Argentina

Unilever de Argentina

Liquids Hall Upgrade - Tortuguitas Plant Extended Basic Engineering on civil, mechanical, piping and electrical disciplines. Plant Drains Layout revision. Upgrading and expansion of water lines, compressed air and fire system. Lightning and power supply...

Unilever de Argentina

Unilever de Argentina

Technical support and on site projects monitoring / Engineering development On-site supervision of assembly projects in different areas of the Plant. At the same time, the following projects were developed in our technical office: Remo Project Cataratas Project Bonzai...

AkzoNobel

AkzoNobel

MP dossing station in Solvent Base Plant F&G system replacement technical evaluation. Multidisciplinary detail engineering development for the new MP dossing station. Compact metal structure calculation and design for the assembly of storage tanks for each raw...

Unilever de Argentina

Unilever de Argentina

Dazzle Pre-Feed - Gualeguaychú Plant On-site assistance of qualified professionals in engineering and cost estimate. On-site surveys and plant staff interviews for the correct evaluation of the project. Cost estimate including equipments, mounting and construction....

SC Johnson

SC Johnson

Firefighting system - Pilar Plant Phase 1 and 2 Conceptual Engineering development. Investment cost estimate. Basic and detail engineering development. Purchasing management for construction. Construction management, including pre-assembled in workshop. As-built...

SC Johnson

SC Johnson

DEPA 340 Depalletizer - Pilar Plant Engineering and modiffication of the current depalletizer. Skid manufacture in workshop. Current installations adjustment. Mechanical, instrument and control materials specification and purchase. New PLC programming. FAT and SAT...

SC Johnson

SC Johnson

Mr. Músculo Cream - Pilar Plant Conceptual Engineering development for investment evaluation. Proposal for process modification. List and cost of main materials and equipments. Final report for investment approval.

SC Johnson

SC Johnson

Expansion of Paraffin Tank - Pilar Plant Conceptual Engineering development for investment evaluation. List and cost of main materials. Final report for investment approval.

The Clorox Company

The Clorox Company

Construction management - Aldo Bonzi and Pilar Plants Construction management for several projects. Supplies, materials and equipment supervision. On-site solutions resolution and approval, typical of the construction and mounting works.

The Clorox Company

The Clorox Company

AVO and Doypack packing line - Aldo Bonzi Plant On-site survey to study packing processes in rigid container and doypack. Analisys of improvements to reduce bottlenecks. Possible modifications study to existing machines. Possible replacement of current lines market...

The Clorox Company

The Clorox Company

Sewage treatment plant - San Juan Plant BWTP Preliminary studies, including on-site surveys to verify current plant installations and utilities capability. Survey monitoring and soil sampling to do the soil study. Sewer drainage ducts verification and redesign. A...

Reckitt Benckiser Argentina S.A.

Reckitt Benckiser Argentina S.A.

Explosive atmosphere area classification Explosive atmosphere area classification study, including on-site surveys to verify plant installations. Classification area draw development. Final report.

Reckitt Benckiser Argentina S.A.

Reckitt Benckiser Argentina S.A.

Guarding Machine Machines and equipment on-site surveys that are part of the production process. Office work to analize the information. Documents generation with recommendations. Compliance analysis with the company’s standard safety standards. Modification...

Reckitt Benckiser Argentina S.A.

Reckitt Benckiser Argentina S.A.

Hazop Study - Alcohol (Flammable), hydrochloric acid and hydrogen peroxide installation. On-site surveys for facilities verification. Office work for node analysis / risk matrix. Workshops / plant sessions, risk assessment in operation with the plant staff involved in...